the square foot cost for composite deck

500 Boylston Street

The construction project was managed by Bond Brothers. It cost $100 million to build. The site contains approximately 137,000 square feet 12,700 m 2 of land area, with approximately 500 feet 150 m of frontage on Boylston Street. The first six floors are retail and small office space. Above that there is a 19-story office tower with Class A .

Scaled Composites Stratolaunch

Many of the aircraft systems have been adopted from the Boeing 747-400, including the engines, avionics, flight deck, landing gear and other systems, reducing development costs. It will require 12,000 ft 3,700 m of runway to lift-off. It should release its rocket at 35,000 ft 11,000 m .

Airbus A380

In 2015, Airbus said development costs were €15 billion £11.4 billion, $16.95 billion , though analysts believe the figure is likely to be at least €5bn $5.65 Bn more for a €20 Bn $22.6 Bn total. In 2016, The A380 development costs were estimated at $25 billion for 15 years, $25–30 billion, or €25 billion $28 billion .

BMO Plaza

Cost: $60 million: Height; Roof: 401 ft 122 m Technical details; Structural system: Steel beam with composite concrete and metal deck: Floor count : 28: Floor area: 673,000 square feet 62,500 m 2 Lifts/elevators: 10: Design and construction; Architect .

Cost to Build a Deck - How Much Money to Replace and Install a Deck

Jun 2020 If the deck is old or decrepit, removal costs $5 to $ 5 per square foot, according to Remodeling magazine, and a new composite deck is over

Cost of Deck Construction in Calgary - Composite vs Wood

You are expected to shell out about $7,000 to build a deck measuring 200-500 square foot. A smaller deck will cost you less for about $2,000. Many factors can

GCU Arena

The main video board measures 15 feet 4.6 m tall by 35 feet 11 m wide and weighs around three tons. Design for the facility was done by 360 Architecture and Tempe-based Architekton. 13 When construction of the arena was complete there were a total of 255,000 man hours, 8,870 yards of concrete, 41,000 bricks, 793 tons of structural steel, 75 miles 121 km of electrical wiring, and 2,300 .

Abraj Al Bait

The crescent was constructed in Dubai by Premier Composite Technologies in April 2011. The crescent is made of fibreglass-backed mosaic gold , and it weighs up to 35 tonnes. Peugeot Joseph, the company official, said a team of five engineers and a hundred workers carried out the project, which cost 90 million United Arab Emirates dirhams and took three months to build.

DuSable Bridge

The counterweights are below the level of the lower deck and when the bridge is opened they swing down into 40-foot-deep 12 m reinforced concrete tailpits that descend 34.5 feet 10.5 m below the surface of the river. Each of the two tailpits is supported on nine cylindrical foundation piers.